Case Study: Air-Cooled Chiller Install With Double CMOD Setup

Overcoming Tight Headroom Restrictions: Air-Cooled Chiller Install With Double CMOD Setup LGH was called upon to provide equipment for a long-time customer, AMS Mechanical, performing an install of five air-cooled chiller units into a new data center being constructed in Northern Illinois. With prior experience installing these units with multi-beam picks, AMS was up to […]

Read More

Case Study: Creative Use of Bull Rigging to Replace an Attemperator

Creative Use of Bull Rigging to Replace an Attemperator Ontario-based contractor WSN Construction was called upon to perform a replacement of an attemperator from one of their boilers, replacing an outdated unit with a newer one composed of grade P91 advanced chromium molybdenum steel. Working within the constraints of the 875MW power plant in Brampton, […]

Read More

Case Study: Powerhouse Duct Conversion

Hayes Mechanical installed new ductwork to reverse the flow of gases going through an existing electrostatic precipitator utilizing air chain hoists, trolleys, MODULIFT® modular spreader beams and rigging supplied by Lifting Gear Hire. THE SITUATION In 2014, Hayes Mechanical was contracted by a Midwest power generation company to execute the “Hot to Cold Duct Conversion” […]

Read More

Case Study: Heating Up Greektown Casino

Dee Cramer lifted a steam boiler atop the Greektown Casino using rented modular spreader bars, shackles, and nylon slings from Lifting Gear Hire. THE SITUATION Dee Cramer, a sheet metal and HVAC contractor in Holly, Michigan, was approached by the owners of Greektown Casino to place a steam boiler on top of their casino to […]

Read More

Case Study: Bayonne Bridge Approaches Project

GCCOM Construction Company Inc. was charged with the task of dismantling the Bayonne Bridge Approaches with the help of rental equipment specialists, LGH. THE SITUATION For Project Manager, Jason Schreck, and his company, GCCOM Construction Company Inc., executing the highest of safety standards is crucial to completing their latest endeavor – the demolition of the Bayonne […]

Read More

Case Study: Rehabilitating Chicago’s Congress Parkway

REHABILITATING CHICAGO’S CONGRESS PARKWAY Walsh Construction lifts and lowers 112’ bridge leafs on the Congress Parkway Bascule Bridge with rented air-powered winches, sheave blocks, and telemetry crane scales from Lifting Gear Hire (LGH). THE SITUATION Rehabilitating and reconstructing a 60 year old bridge can sound pretty daunting, especially if it hasn’t experienced significant repairs since […]

Read More

Case Study: Sound Partnership Gives 2+U Office Tower a Solid Foundation

Omega Morgan Crane Service Inc and Apex Steel Inc were tasked with setting the foundation using a single crane and creative rigging with the help of rental equipment specialists, Lifting Gear Hire. The Situation: For crane superintendent Eldon Ash and senior engineer Kai Farrar of Omega Morgan Crane Services Inc. and owner Kevin Koester of […]

Read More

Case Study: Lifting and Replacing a Coal Transfer Conveyor Tube

Enerfab, Inc. was hired to complete the lifting and replacing of a conveyor tube for a coal transfer facility using rented Modulift® spreader beams from Lifting Gear Hire. The Situation In March of 2015, a 135-foot long conveyor belt at a utility coal transfer facility along the Mississippi River caught fire. The fire buckled the tubular conveyor structure […]

Read More